Two-, three- and multi-family buildings, where one roof is a shared decision and a tenanted building has to keep working throughout.
On a multi-family building the roofing is rarely the hard part. Agreeing the scope between owners, giving tenants notice, keeping the top floor habitable during tear-off and staging materials on a site with no off-street space are what actually decide whether the job runs to programme.
The technical work is the same as a house. The coordination is not, and it is what the programme should be built around.
One roof, several households and a building that has to keep working while the covering is off. That is what decides the programme.
Where a roof is shared, the decision is shared. The technical answer is usually settled long before everyone has agreed what is being paid for.
Tear-off is loud, dusty and directly overhead. Tenants on the top floor need notice and a realistic picture of which days are worst.
On a dense street with no off-street space, materials and waste have to arrive and leave on the day they are needed. That caps how much roof can be open at once.
On an occupied building the rule is that whatever is stripped can be made watertight the same day, whatever the forecast says in the morning.
Most multi-family buildings here carry a lower rear addition at a shallower pitch, which often needs a different covering from the main slope and should be priced as its own element.
Where several parties are paying, the thing that prevents a dispute is a written scope that says what is included and what the deck allowance covers.
Mixed-type streets mean the building next door is not a guide. Each multi-family property needs its own scope rather than a figure carried over from a similar-looking address.
Nearly three hundred thousand people and over a hundred and ten thousand housing units, ranging from nineteenth-century brownstone rows to very recent high-rise construction.
Reference point: the second-largest city in New Jersey, across Newark Bay.
A city this size has no single roof type, so the era and the form of the specific building decide everything. A brownstone row and a twenty-storey tower share a postcode and nothing else.
Any claim that Jersey City roofs behave a particular way should be treated with suspicion -- the only useful question is which part of it, and what the building actually is.
Nearly three hundred thousand people and over a hundred and ten thousand housing units, ranging from nineteenth-century brownstone rows to very recent high-rise construction.
All areas coveredNewark sits in a humid subtropical shading into humid continental (Koppen Cfa/Dfa) zone with a full freeze-thaw winter — the combination hardest on flashings, fixings and mortar.
Water that gets into a lap, a joint or a hairline crack and then freezes expands. Northern New Jersey cycles through that repeatedly each winter, so small defects do not stay small.
Melt moves slowly under a snow layer and refreezes at the cold eave, backing water up under the covering where pitch does not help. That is what the ice barrier exists for.
Rain coming in sideways gets under laps that shed vertical rain perfectly well, which is why edge and flashing detail matters more than the covering specification.
The same job in the areas next door, and the other work we take on in this one.
See every area we do multi-family roof replacement in across Newark →
General guidance about how these buildings are re-roofed, not a survey of any particular property.
Everyone who owns part of it, which is why the scope takes longer to agree than the roof takes to fit. A written scope stating what is included and what the deck allowance covers is what prevents a dispute later.
Because the era does. On mixed streets two addresses a block apart can have different deck construction, different layer counts and different ventilation, and those decide the price far more than the roof area does.
Replacing more than a quarter of a roof surface within any twelve months requires a construction permit under the New Jersey Uniform Construction Code. A full replacement is over that threshold, so yes — and the work is inspected at stages.
Tell us what the building is and roughly how old the roof is. That is usually enough to say what the job involves before anyone goes up.