Low-slope systems replaced with the falls corrected, not just the membrane renewed over the same standing water.
Re-covering a flat roof without correcting the fall reproduces the failure on a new membrane. If water stood on the old system it will stand on the new one, in the same places, and the seams under it will be tested continuously rather than occasionally.
On a low-slope roof the specification argument is usually about the membrane, and the thing that decides the outcome is usually the drainage.
A flat roof that ponded before will pond again under a new membrane, in the same places, unless something about the drainage changes.
Water still standing forty-eight hours after rain means the fall, the drains or the deck have moved. A new membrane laid over that is being tested continuously instead of occasionally.
A blocked or undersized outlet turns the roof into a shallow tank. Replacement is the only realistic opportunity to correct outlet positions, so it should be taken.
Where the structural deck cannot be re-pitched, tapered insulation builds the fall into the build-up. It is the difference between a roof that drains and one that merely has a membrane.
Pipes, vents, mechanical curbs and fixings each get flashed individually. On a large roof these outnumber every other failure point put together.
Saturated boards under an old membrane stay saturated once a new one is over them. If the survey shows wet insulation it comes out, or the new roof is compromised on day one.
The membrane turning up a wall, and the bar that holds it there, take the stress. The field of the membrane rarely fails first.
This is where flat roof replacement is a real engineering job. A shallow fall over a long span leaves water standing for days, and tapered insulation to build the fall back in is usually the difference between a roof and a pond.
Nearly eleven square miles at low density, mixing suburban residential streets with a very large industrial and refinery district.
Reference point: the city south of Roselle, stretching east toward the industrial waterfront.
The industrial roofs here are among the largest in the service area: single-span low-slope systems where the replacement is driven by drainage falls, mechanical penetrations and phasing around a working site.
On a plant roof the constraint is nearly always keeping the building operating, which decides the sequence before any roofing question does.
Nearly eleven square miles at low density, mixing suburban residential streets with a very large industrial and refinery district.
All areas coveredNewark sits in a humid subtropical shading into humid continental (Koppen Cfa/Dfa) zone with a full freeze-thaw winter — the combination hardest on flashings, fixings and mortar.
Water that gets into a lap, a joint or a hairline crack and then freezes expands. Northern New Jersey cycles through that repeatedly each winter, so small defects do not stay small.
Melt moves slowly under a snow layer and refreezes at the cold eave, backing water up under the covering where pitch does not help. That is what the ice barrier exists for.
Rain coming in sideways gets under laps that shed vertical rain perfectly well, which is why edge and flashing detail matters more than the covering specification.
The same job in the areas next door, and the other work we take on in this one.
See every area we do flat roof replacement in across Newark →
General guidance about how these buildings are re-roofed, not a survey of any particular property.
Only if the water drains. A membrane laid over a fall that already ponds will pond in the same places, and the seams under standing water are tested continuously rather than occasionally. Correcting the fall is usually the actual job.
No. Large single-span roofs are phased so that whatever is stripped can be made watertight the same day, and the space underneath stays in use throughout.
Replacing more than a quarter of a roof surface within any twelve months requires a construction permit under the New Jersey Uniform Construction Code. A full replacement is over that threshold, so yes — and the work is inspected at stages.
Tell us what the building is and roughly how old the roof is. That is usually enough to say what the job involves before anyone goes up.