A full tear-off and a new roof system, specified for the building it is going on rather than to whatever is cheapest on the van.
The part of a replacement that decides how long it lasts happens in the hour after the old covering comes off, when the deck is visible for the first time in decades. Everything before that is logistics and everything after it is installation; that hour is the only chance to find out what is actually being roofed over.
A replacement is not a covering swap. It is a system -- deck, underlayment, ice barrier, flashings, ventilation and covering -- and the covering is the part that matters least.
Everything before that hour is logistics. Everything after it is installation. That hour is the only time anyone sees what is actually being roofed over.
How many layers, what the covering is, and what the building has had done to it. The layer count alone can decide whether a tear-off is optional or mandatory.
Not to the previous covering. A new system laid over an old one inherits every defect underneath it and hides the evidence of them at the same time.
Soft, delaminated or rotted sheathing is replaced now, while it is reachable. This is the single most common reason an honest quote carries a stated allowance rather than one flat number.
Ice barrier at the eaves, underlayment, valley and penetration flashings, edge metal, then the covering. Most premature failures are a flashing detail, not a shingle.
Intake at the eaves and exhaust at the ridge, balanced. A sealed roof deck with no path for air cooks the covering from underneath and shortens its life regardless of what it cost.
On a large single-span roof the work is phased by definition — no one strips the whole thing. What can be opened is set by what can be made watertight the same day, and that governs the programme far more than the area does.
Nearly eleven square miles at low density, mixing suburban residential streets with a very large industrial and refinery district.
Reference point: the city south of Roselle, stretching east toward the industrial waterfront.
The industrial roofs here are among the largest in the service area: single-span low-slope systems where the replacement is driven by drainage falls, mechanical penetrations and phasing around a working site.
On a plant roof the constraint is nearly always keeping the building operating, which decides the sequence before any roofing question does.
Nearly eleven square miles at low density, mixing suburban residential streets with a very large industrial and refinery district.
All areas coveredNewark sits in a humid subtropical shading into humid continental (Koppen Cfa/Dfa) zone with a full freeze-thaw winter — the combination hardest on flashings, fixings and mortar.
Water that gets into a lap, a joint or a hairline crack and then freezes expands. Northern New Jersey cycles through that repeatedly each winter, so small defects do not stay small.
Melt moves slowly under a snow layer and refreezes at the cold eave, backing water up under the covering where pitch does not help. That is what the ice barrier exists for.
Rain coming in sideways gets under laps that shed vertical rain perfectly well, which is why edge and flashing detail matters more than the covering specification.
The same job in the areas next door, and the other work we take on in this one.
General guidance about how these buildings are re-roofed, not a survey of any particular property.
Because a covering laid over an old one inherits every defect beneath it and hides the evidence at the same time. It also uses up the second of the two layers New Jersey permits, so the next replacement is a mandatory strip regardless.
No. Large single-span roofs are phased so that whatever is stripped can be made watertight the same day, and the space underneath stays in use throughout.
Replacing more than a quarter of a roof surface within any twelve months requires a construction permit under the New Jersey Uniform Construction Code. A full replacement is over that threshold, so yes — and the work is inspected at stages.
Tell us what the building is and roughly how old the roof is. That is usually enough to say what the job involves before anyone goes up.